
PATENTS PENDING
53
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
3. On the left side of the platform,
loosen jam nut on 3” ground
switch adjustment screw. Next,
turn adjustment screw clockwise
until the switch activates with an
audible “click” (FIG. 53-1). Then
turn screw approximately 1/2-
turn clockwise.
3” GROUND BRACKET, LH SIDE
FIG. 53-2
CONTROLLER: 3 IN SW
FIG. 53-3
4. Lift the 3” ground bracket
to deactivate switch (FIG.
53-2). The display on Con-
troller should read “3 IN SW”
(FIG. 53-3).
3 IN SW
TURNING LH GROUND SWITCH
FIG. 53-1
ADJUSTMENT
SCREW
JAM NUT
Commentaires sur ces manuels